Collective housing — perspective 1
HOUSING · 33 APARTMENTS

Collective housing

33 apartments above a commercial base, transforming an existing commercial brownfield into a mixed-use building. Four residential levels respond to the site’s change in level, with separate residential access and landscaped pedestrian connections.

Programme
33 apartments and a commercial base
Organisation
Four residential levels with separate access
Landscape
Planted pedestrian links and permeable surfaces
MY CONTRIBUTION

Architecture and BIM coordination.

Development of plans, sections and elevations, coordinating their consistency within the architectural model.

My approach, from sketch to delivery

The challenge

Fit 33 apartments and a retail base onto a site with changing ground levels.

The response

Four residential levels, separate entrances and planted outdoor spaces organise the different uses.

Collective housing — perspective 2Project view

A mixed-use building.

The project combines a commercial lower level with 33 apartments on four residential levels. The building uses the site’s topography to organise the entrances and distinguish residential and commercial uses.

Collective housing — perspective 4Project view

Access designed for daily life.

Residential access connects to the upper site level. Pedestrian routes link the building to surrounding activities, with accessible paths, a secure cycle room and dedicated residential parking.

Collective housing — site planProject view

Transforming a commercial brownfield.

The redevelopment introduces planting and more permeable surfaces on a largely sealed commercial site. A planted pedestrian spine connects existing and new buildings, with species adapted to the Mediterranean climate.

METHODS & TOOLS

From project needs to working methods.

Examples of tools I develop for these production and coordination needs.

NEXT PROJECT05 / 07Coffee productionProduction · Storage · ReceptionExplore the project